If you’re bidding site work anywhere in Dallas-Fort Worth, Texas, you already know the dirt around here doesn’t play nice. North Texas clay will eat teeth, stall cycles, and burn through fuel faster than your estimator planned for — especially if you brought the wrong size machine.
The two excavators we rent most for commercial jobs in this part of the state are the Cat 320 (22-ton class) and the Cat 336 (36-ton class). Both will dig this clay. Only one will dig it efficiently for your specific job. Here’s how to pick.
Know What You’re Actually Digging In
Most of the DFW metroplex sits on the Blackland Prairie — dark, heavy, high-plasticity clay with a shrink-swell index that’s caused more foundation lawsuits than any other soil in Texas. West of I-35W, out toward Wise, Parker, and Palo Pinto counties, you hit the Eastern Cross Timbers: sandier on top, but still clay underneath past the first couple of feet.
The short version: almost every job site in our delivery area has expansive clay within the first 3–4 feet of grade. That clay expands when wet and shrinks when dry — sometimes 6% or more by volume. That movement is why your neighbors’s driveway is cracked, and why your excavator behaves like it’s in a different soil every week.
Wet Clay and Dry Clay Are Two Different Jobs
Same dirt. Completely different machine behavior.
Wet clay — anytime in the 48 hours after a decent rain — is heavy, sticky, and will pack a bucket so tight you’ll need a shovel to clean it between passes. Cycle times go up 30% or more. On a 336 burning 8–12 gallons an hour, that’s real money disappearing per shift.
Dry clay in August is basically shale. Teeth dull fast, breakout force goes through the roof, and a 320 on hard dry clay will tell you pretty quick whether you brought enough machine. You’ll feel the hydraulics work. You’ll feel it in the bucket fill percentage. You’ll feel it in fuel burn.
The sweet spot is about 3–10 days after a soaking rain, when the top few feet have drained but the clay still has enough moisture to cut cleanly. That window closes fast in a Texas summer.
Cat 320 or Cat 336 — Which One Your Job Actually Needs
This is the call that makes or breaks the economics of the job.
Rent the Cat 320 when:
- You’re doing commercial site work, utility installation, or residential demo. The 320 is the workhorse for 80% of DFW commercial dirt jobs.
- Trench depth is under 20 feet and you’re running 24–48″ buckets.
- You’re loading tandems or small end dumps — the 320 matches those trucks cleanly.
- The job site has tight access or urban conditions where a 36-ton machine can’t swing.
- You need a machine that’s easy to transport — the 320 moves on a standard lowboy with a Texas Annual Permit.
- Production targets are moderate — a few hundred to low-thousand yards a day.
Fuel burn on a 320 runs roughly 4–6 gph in typical conditions. For most contractors on most DFW jobs, the 320 is the right answer.
Step up to the Cat 336 when:
- You’re doing mass excavation — basements, detention ponds, large building pads, stock ponds over about a half-acre.
- You’re loading belly dumps, large end dumps, or off-road haul trucks and need bucket capacity to keep them moving.
- The dirt is hard dry clay or caliche and you need the breakout force to cut it without beating the machine to death.
- Trench work is deep (over 20 feet) or involves large-diameter pipe — storm drain, major water/sewer, pipeline.
- You’re on a production schedule where yards-per-hour is the bid number, not the safety net.
- The job is heavy demo — concrete, rebar, structural steel that a 320 with a hammer will struggle with.
The 336 runs 1.5–3 cubic yard buckets and puts around 300 hp to the ground. It’ll dig hard dry North Texas clay without complaining. Fuel burn is roughly double the 320, but so is production on the right job. If you’re moving serious volume, the 336 is cheaper per yard even at the higher rental rate.
The trap to avoid
The most expensive mistake we see: contractors try to save a few hundred bucks a day by renting a 320 for a job that really needs a 336. Two days in, they’re behind schedule, hammering the machine, and burning more fuel per yard than the 336 would have. Right-size the iron to the job, not the bid.
If you’re borderline — call us. We’ll tell you straight which one fits your scope.
Bucket and Attachment Choices That Earn Their Keep
On both machines, skip the smooth grading bucket for primary digging. You want a heavy-duty tooth bucket, and you want the teeth sharp. A dulled bucket in dry Texas clay can cost you 15–20% production before you notice.
- Cat 320: 36″ general-purpose tooth bucket for most utility and site work. Step down to 24″ for tighter trenching, up to 48″ for cleanup and loading.
- Cat 336: 42–48″ tooth bucket is the sweet spot for mass ex. Go to 60″+ only if you’re loading big haulers and the material is reasonable to cut.
Always ask about a hydraulic thumb. Clay comes out in chunks, and a thumb lets you pull roots, stack spoil cleaner, and handle demo without climbing off the machine every ten minutes. On demo jobs it’s not optional — it’s the difference between a one-day teardown and a two-day teardown.
For hard dry clay or rock, a hydraulic breaker pays for itself fast. Both the 320 and 336 are plumbed for one.
Track Shoes Matter More Than You Think
Both the 320 and 336 run steel triple-grouser tracks. The variable is shoe width, and it matters more in North Texas than most operators realize:
- Narrower shoes (600mm) bite harder in dry clay and give you better traction for cutting. Standard on most 336s.
- Wider shoes (700–800mm) float better on wet clay and soft pad material. Worth requesting if you’re working fresh grade or after a rain event.
Tell us your site conditions when you book — we’ll confirm shoe width on the specific unit before it leaves the yard.
Trench Walls Will Lie to You
Here’s where North Texas clay gets genuinely dangerous.
Damp clay will hold a vertical wall beautifully. You can dig a 15-foot trench with a 336 and sides so clean they look like formwork. That’s a trap. OSHA classifies most Texas clay as Type B soil at best — and after any moisture change, a wall that held yesterday can sheet off in slabs today without warning.
Never trust the wall. Anything over 5 feet with people in the hole needs benching, sloping, or a trench box — not an opinion. Every year somebody in this state dies because they trusted a clay wall that had no business holding.
And call 811 at least two business days before you dig. Texas law requires it, and North Texas is a spiderweb of gas, fiber, and high-voltage you absolutely do not want to find with a bucket tooth — especially on a 336 that won’t even notice it hit something until the utility’s on fire.
The Pro Move: Pre-Wet Dry Clay with a Water Truck
If you’re digging in drought conditions — which in Texas is more summers than not — the single best thing you can do is pre-wet the dig area the day before.
Run a 4,000–5,000 gallon water truck over the pad, soak it down, let it sit overnight. That moisture penetrates the top 12–18 inches and makes the first pass feel like you’re cutting butter instead of rock. On a 336, that’s the difference between 8 gph and 12 gph, plus measurably faster cycles and less wear on teeth, sticks, and hydraulics.
We rent water trucks alongside our excavators for exactly this reason. On a week-long 336 rental, the water truck often pays for itself in the first two days through fuel savings and production alone — before you even count the dust-control benefit once the haul road gets busy.
Quick Pre-Dig Checklist
Before the machine rolls off the lowboy:
- Called 811 at least 2 business days ago
- Right machine for the scope — 320 for most site work, 336 for mass ex and deep/hard work
- Know what’s in the first 4 feet (top-soil depth, clay start, any rock or caliche)
- Checked the 10-day forecast — not just tomorrow
- Bucket and attachments matched to the material (teeth sharp, thumb if you’re doing demo)
- Shoe width confirmed for site conditions
- Access route planned for both dry and wet conditions — plus space for the lowboy
- Spoil location that won’t become a swamp if it rains mid-job
- Trench protection plan if going over 5 feet with anyone in the hole
- Water truck booked if digging in drought conditions
Bottom Line
North Texas clay rewards contractors who match their iron to the job and punishes the ones who don’t. The Cat 320 will handle most DFW commercial dirt work cleanly. The Cat 336 is what you want for mass ex, deep work, hard dry clay, and anything where yards-per-hour is the bid number.
If you’re not sure which one fits your scope, call us. We rent 320s and 336s on monthly terms throughout the DFW metroplex and North Texas, and we’ll tell you straight which machine — and which bucket, thumb, and shoe setup — will actually make you money on your job.
No B.S. Just the right iron for the dirt you’re actually digging.
Machinery Supply rents Cat 320 and 336 excavators, and a variety of other equipment throughout the Fort Worth / DFW metroplex and North Texas. Same-week delivery on most machines. Call for a quote.